Seaglider Ballasting Checklist¶
Mission: ________________________________ Seaglider ID: _____________
Engineer: ________________________________ Date: ________________
Source
Paraphrased from the APL-UW IOP office-hours session on ballasting and volmax estimation and from operator service correspondence. See the Ballasting Procedure and Trim Sheet & Re-ballasting for the full explanation of each step.
1. Setup¶
- Trim sheet updated for every change since last ballast (sensors, batteries, VBD, fairings, wings/rudder)
- Target density for the mission written into the trim sheet — and checked if the glider just came back from service
- Lead and foam inventoried: each piece weighed, position noted, every hull face photographed
- Wings and rudder weighed; set fitted recorded
- Freshwater tank filled, deep enough to fully submerge the glider vertically (≥ ~2 m)
- Hanging scale / load cell rigged over the tank
- Suspension line ready (ties off at the rudder)
- Comms cable available and connected, with slack — no surface expression
- Antenna left disconnected and dangling free
2. Dry Weight¶
- Complete glider (wings, rudder, everything) weighed dry — record mass M
- M compared with the trim sheet's summed mass — difference: ______ g (tens of grams OK; hundreds = find the error)
- Glider soaked overnight, fully submerged and vertical, in the tank
3. Tank Density¶
- Tank temperature recorded (and salinity, if not freshwater)
- Tank water density computed
4. Weight-in-Water at Multiple VBD Positions¶
- Weighed in water at ≥ 5 VBD positions (e.g. 2000 / 2250 / 2500 / 2750 / 3000 counts)
-
volmaxcomputed at each position - All values agree to within ~±5–10 cc (outliers re-checked)
- Average
volmaxrecorded: __________ cc
4b. Neutral-Point Trim Test (if used)¶
- Predicted
$C_VBD/$C_PITCHfor tank density taken from the trim sheet - VBD stepped to neutral mid-water, pitch to level, roll swept and centred
- Observed
$C_VBD______$C_PITCH______$C_ROLL______ recorded with tank density - Trim sheet calibrated to the observed centers ("mystery mass")
5. Weight Adjustment¶
- Target thrust and target deployment density entered into the vis Ballast worksheet
- Lead added/removed per the worksheet's recommendation
- Maximum thrust in target water checked — aim for ~250–300 cc
- Pitch-mass stroke near nominal (~70 %) after lead changes
-
$MASS,$C_VBD,$C_PITCHupdated on the glider and insg_calib_constants.m - ±100 cc uncertainty accounted for in the deployment plan
6. Before First Water Time¶
- Spare foam, lead and tools packed for on-deck adjustment; crew briefed
- First dive planned as a tethered / on-a-line test
- First mission is shallow, enclosed, and local — not open-ocean or deep
- Post-tank weight/volmax figures logged for this glider
Notes:
___________________________________________________________________________
| Role | Name | Signature | Date |
|---|---|---|---|
| Ballasted by | |||
| Checked by |