Mission Planning Checklist

Print this page


Mission title / ID:  _____________________________________________

PI / Science Lead:  ________________________    Glider S/N:  _______________

Planned deployment date:  _______________   Planned duration:  _________

Date of this review:  _______________     Reviewer:  ___________________


1. Mission Objectives

  • Primary science objective defined and recorded in mission plan
  • Required track and/or area of operation specified
  • Required sensors identified and confirmed available
  • Science sampling configuration defined (depth range, yo rate, sampling interval)
  • Mission duration and endurance requirements calculated
  • Secondary / opportunistic objectives identified and prioritised
  • Mission plan signed off by both Science Lead and Glider Logistics Lead

2. Area of Operations

  • Operational boundary polygon defined and recorded

Tides

  • Tidal range and current speeds assessed for the deployment area
  • Tidal phasing considered in track design and surfacing timing
  • Tidal effects on ballasting target reviewed

Shipping lanes

  • Shipping lane positions identified (marinetraffic.com or equivalent)
  • Track designed to minimise time in high-traffic corridors
  • AIS monitoring plan confirmed for duration of mission

Recreational traffic

  • Recreational boating, sailing, and water-sports activity in area assessed
  • Proximity to marinas, race courses, and popular anchorages checked
  • Seasonal recreational patterns considered for deployment timing

Fishing grounds

  • Active fishing grounds, trawl corridors, and longline areas identified
  • Local fisheries authority or fishing association contacted where relevant
  • Piloting strategy for minimising bottom time in trawled areas confirmed

Bathymetry & sea floor characteristics

  • Accurate bathymetry chart sourced and reviewed for the full track
  • Minimum water depths along track confirmed adequate for planned dive depth
  • Seamounts, pinnacles, and steep slope areas identified
  • Altimeter target altitude set with appropriate margin for local seabed roughness
  • Bottom sediment type noted where relevant (soft vs. hard — affects bottom-strike risk)
  • Abort waypoints and emergency recovery areas identified along the track

Other hazards

  • Active military exercise areas checked (NOTMARs reviewed)
  • Subsea cables, pipelines, and aquaculture installations reviewed
  • Marine Protected Area boundaries checked; operating conditions confirmed

3. Risk Assessment

  • Risk assessment document written or updated for this mission
  • Environmental risks identified and mitigation measures defined
  • Technical risks identified (glider age, sensor reliability, battery state)
  • Operational risks identified (vessel availability, personnel coverage, comms gaps)
  • Insurance availability assessed and arranged if required
  • List of potential emergency recovery vessels and contact points compiled
  • Contingency plan documented (back-up glider, emergency recovery procedure)
  • Risk assessment reviewed and signed off by Mission Lead

4. Glider & Sensor Preparation

  • Maintenance and calibration history reviewed; any preemptive service identified
  • Sensor calibration status confirmed current for all payload sensors
  • Ballasting target calculated using local water density data (CTD, models, or historical records)
  • Ballasting data source recorded: ___________________________________
  • Previous mission notes reviewed for oddities, setting changes, or unresolved faults
  • Glider labels and contact information checked / updated
  • Pre-deployment lab test slot confirmed

5. Piloting & Communications Plan

  • Piloting rota established for at least the first deployment phase
  • Experienced pilot confirmed for launch and first dives
  • Escalation contact list prepared and distributed to all pilots
  • Missed-call protocol defined (number of missed calls before escalation)
  • Communication method between pilot and field team agreed and tested
  • Satellite communication tested with vehicle (link confirmed)
  • Shore-side monitoring schedule documented
  • Piloting alert system verified

6. Logistics

  • Deployment vessel confirmed and booked
  • Staff travel and accommodation arranged
  • Equipment shipping arranged (domestic / international as applicable)
  • Dangerous goods certification confirmed for lithium battery shipment
  • ATA carnet prepared if applicable
  • Third-party recipients of hazardous goods notified

7. Regulatory & Notifications

  • Diplomatic clearance obtained (international deployments): ref _____________
  • NOTMAR / Notice to Mariners filed: ref _____________________________
  • Coastguard notification submitted: ref _____________________________
  • Research permits / environmental authorisations obtained: ref ____________
  • Harbour master notified (if deploying from port): ref ___________________
  • All confirmation receipts archived in mission folder

8. Data & Metadata

  • Data flow set up with regional Data Assembly Centre (DAC)
  • Minimum OceanOPS metadata fields completed (programme, WMO ID, PI, deployment position, agency, sensor models, glider model, serial number)
  • Metadata submitted to OceanOPS ahead of deployment
  • File naming conventions and repository structure confirmed with DAC
  • Automated data transfer tested end-to-end

9. Final Review

  • Mission plan reviewed by a team member not involved in its preparation
  • All team members briefed on plan, contingencies, and abort criteria
  • Health & Safety briefing completed; SOP signed by all personnel
  • Mission plan archived in designated location
  • Go / No-Go authority confirmed: ___________________________________

Sign-Off

Role Name Signature Date
Science Lead / PI
Glider Logistics Lead
Pilot (Launch)
Reviewer

Mission Planning Checklist — v1.0