Slocum Recovery Checklist¶
Mission: ________________________________ Glider S/N: _____________
Pilot / Engineer: ______________________________ Date: ________________
Source
Paraphrased from NorGliders / University of Bergen (UiB) field procedure notes (SL04, SL11, SL12). See the Field Recovery Procedure and Remote Pilot Recovery Procedure for the full explanation of each step.
1. Pre-Recovery Coordination¶
- Field team arrival time, recovery time, and schedule-change likelihood discussed with the remote pilot
- Communication method and position-update frequency agreed
- Glider configuration confirmed call-in interval, strobe
2. Remote Pilot — Set to Drift¶
- Glider caught on the surface; surfacing interval shortened
- XML script disabled in SFMC
-
u_max_time_in_gliderdosset for the expected drift duration -
put c_de_oil_vol 420— max buoyancy -
strobe on(unless broad daylight) - Field team receiving regular GPS position updates
3. Field Team — Organize the Deck¶
- Grapple on 20 m line, boathook, glider cart staged
- Transport case opened, latches flattened
- Communication with remote pilot confirmed for glider position
4. Deploy Nose Recovery Line¶
- Remote pilot sends
put c_recovery_on 1when field team is ~10 min out or has visual contact - Nose release confirmed can take up to 10 min to unravel
- If not released after 10 min: retry command, boat-hook tap, or shallow dive test (see Remote Pilot procedure troubleshooting)
5. Recovery¶
- Vessel approached glider from downwind
- Line grappled/hooked and hauled in; overhand knot tied and attached to A-frame/crane
- Glider lifted nose-first out of the water
- Glider lowered onto cart, nose into ring-mount, strap secured
- Wings removed
- (If nose system failed) Backup workboat recovery used — see Field Recovery Procedure
6. Shutdown (Remote Pilot)¶
- Glider positioned with clear view of sky; pilot notified
-
put c_air_pump 0— air bladder deflated -
put c_de_oil_vol -420— ballast pump retracted;get m_de_oil_volconfirms −420 -
exit— glider shut down - UTC shutdown time recorded and passed to field team
7. Stowing (Field Team)¶
- Within 30 minutes of shutdown: green plug removed, red plug installed
- Glider placed in transport case, cart legs seated correctly
- Both ratchet straps fastened, lid replaced
Sign-Off¶
| Phase | Completed by | Time (UTC) | Notes |
|---|---|---|---|
| Set to drift | |||
| Nose recovery deployed | |||
| Glider aboard | |||
| Shutdown complete | |||
| Stowed |
Notes:
___________________________________________________________________________